The project consists in an all new technical facility on a green field site, creating 5,700m2 of floor space over two levels. It includes the instillation of specialised technical infrastructure to the site and within the facility itself. Read more>
The project consists of the upgrade of services infrastructure from 55% capacity to 100% capacity, whilst maintaining an operating environment within the Strategic Hub. Read more>
The project consists of an all-new technical data hosting facility on an existing industrial site over two levels. It includes the installation of highly specialised electrical, mechanical and BMS services to provide an N+1 world class facility. Read more>
The project consists of the construction of a substation for Integral Energy including large cable basement, three transformer bays, Read more>
OneBuild was awarded the Rouse Hill Switching Station following a hard dollar tender process. The project comprises the construction of a new Switching Station Control Building for Integral Energy together with security fencing, concrete driveway and other associated works. Read more>
New Substation with three transformer bays on a brown field site, live 132KV cables running through it. Read more>
The project consists of the refurbishment and installation of a new structural steel mezzanine flooring in an existing Telstra Critical Infrastructure Facility. Read more>
Independent ASIO class A secure telehousing facility constructed within operational Exchange building, consisting of structural reinforcing and integrated mechanical and electrical services. Read more>
The project comprises the construction of a new
Read more>New generator and diesel tank room. Read more>